The deed
We ask which name the terrace sits under. A long habit of drying clothes upstairs is not that answer.
Kovilambakkam houses with two families
In these layouts a building is often two homes. One family downstairs, one upstairs, one terrace. Both may believe the roof is theirs. We do not draw a plant until the deed, or a short note from both, says who may use it. The visit from Madipakkam is free.

Before the row is counted
Between Madipakkam and Medavakkam, many houses were sold as portions. The ground floor has one kitchen. The first floor has another. The terrace is a single slab above both. The upstairs family may have been using it for years. That habit is not a deed. If the document gives the roof to one name, that name decides. If both portions claim it, both sign. A plant fixed for one side, against the other, is a dispute we will not start.
Once the names are clear, the row is ordinary. The tank stays. A walkway stays beside it. The size follows the daytime bill of the household that will use the power. City-wide module choice is on panels for a Chennai home. An irregular parapet beside the eri is the Keelkattalai case. Whether another floor is still coming is the Medavakkam question. Here the first limit is who may stand on the roof.
Both names in writingOne terraceVisit from MadipakkamIn this order
We ask which name the terrace sits under. A long habit of drying clothes upstairs is not that answer.
Two portions, two signatures. One verbal yes from the upper floor is not a layout.
The tank stays. The walkway stays. Modules take the clear area for the household that will use the units.
Central assistance needs cells and modules made in India. Eligible homes can receive up to ₹78,000. The amount follows the scheme on the day you apply.
Who can proceed
A family that owns the whole house can decide alone. A portion house proceeds only after the roof is settled in writing. A small block of flats still needs the association, which is a different paper from a note between two families. A balcony is not a mounting place.
How the row is fixed once the names are clear is on solar panel installation. Modules you already hold are labour, quoted on installation services. The Kovilambakkam figure is on solar panels and prices in Kovilambakkam. How the crew sets the row is on solar panels and installation in Kovilambakkam. The subsidy gap is on panel and price. NDCR against DCR is in that guide before an import is confirmed.
From these portion houses
Yes. The roof visit is free. A recent bill is enough to start. You can stop after we record who may use the terrace. No modules are ordered that day.
Only if the deed says so. If both portions claim the roof, both sign. One verbal yes is not enough to draw a plant.
You decide alone. We size the row to the daytime bill and leave the tank where it is, with a walkway beside it.
Yes. Cells and modules must be made in India. Eligible homes can receive up to ₹78,000, subject to the scheme on the day you apply. NDCR is only if that assistance has already been given up.
A free visit from Madipakkam. We record who may use the terrace, then whether the plant should be DCR.
Request your free quote →