Residential solar · Chennai & Madipakkam

Layouts off Old Mahabalipuram Road

Solar panels for your home in OMR.

Along this highway, the next villa is often still a building site. If that work already stands above your parapet, that side of the terrace stays out of the row. The visit from Madipakkam is free.

An elevated module row above a terrace parapet, with open roof left in front

What the next plot is doing

A floor that is still rising.

Columns or a fresh slab on the neighbouring plot already tell us the shade. Once that floor is closed, it will cover the same side at the same hour each day. We leave that side bare now. We do not fill it and hope the neighbour stops at one storey we cannot see finished. The open part of your own terrace, clear of that side, is what gets counted against the daytime bill.

An empty plot is not a wall. We do not invent one. A finished apartment that already stands higher is the Thoraipakkam case. An office tower across the highway is the Taramani case. If your own next floor is still to come, that is the Medavakkam case. City-wide module choice is on panels for a Chennai home.

Next plotBare on that sideVisit from Madipakkam

Marked before a count

Four checks on a layout terrace.

01

The next plot

We look past your parapet. A building site next door is part of the survey, not a later surprise.

02

What already rises

Columns or a slab above your parapet take that side out of the row. The bright remainder can still be used.

03

An empty plot

Bare land is left as bare land. We do not shrink the plant for a house that has not been started.

04

DCR

Central assistance needs cells and modules made in India. Eligible homes can receive up to ₹78,000. The amount follows the scheme on the day you apply.

Who it suits

A villa with its own terrace, off the highway.

Independent houses in the layouts beside Old Mahabalipuram Road are the usual fit. A flat in a large community cannot claim the common roof. That limit is the Sholinganallur page. A mast already fixed on a smaller block is the Perungudi page.

How the row is fixed once the next plot is marked is on solar panel installation. Modules you already hold are labour from ₹3,000 per kW, materials excluded, on installation services. The OMR figure is on solar panels and prices in OMR. How the crew sets the row is on solar panels and installation in OMR. The subsidy gap is on panel and price. NDCR against DCR is in that guide before an import is confirmed.

Include the next plot in the photo

The neighbour's work, then the row.

Do you visit Old Mahabalipuram Road from Madipakkam?

Yes. The roof visit is free. A recent bill and a photo that includes the next plot are enough to start. No modules are ordered that day.

The house next door is still being built. Do you use the side it will shade?

No, if columns or a slab there already stand above your parapet. That side stays bare.

The next plot is empty. Do you leave that side bare too?

No. An empty plot is not drawn as a wall. We only leave out a shadow that has already started.

Do subsidy plants need DCR modules?

Yes. Cells and modules must be made in India. Eligible homes can receive up to ₹78,000, subject to the scheme on the day you apply. NDCR is only if that assistance has already been given up.

Send a photo that shows the next plot as well.

A free visit from Madipakkam. We mark what already rises beside the terrace, the side that stays bare, and whether the plant should be DCR.

Request your free quote →

Areas we cover